  data centres powered by renewables Ozix <ozix@xizo.am> - 2026-11-24 08:31 +0800
    Re: data centres powered by renewables not@telling.you.invalid (Computer Nerd Kev) - 2026-11-25 07:35 +1000
      Re: data centres powered by renewables Ozix <ozix@xizo.am> - 2026-11-25 06:11 +0800
        Re: data centres powered by renewables Computer Nerd Kev <not@telling.you.invalid> - 2026-11-25 16:42 +1000
          Re: data centres powered by renewables Keithr0 <nothing.to.see@here.com.au> - 2026-11-26 08:55 +1000
            Re: data centres powered by renewables Petzl <petzlx@gmail.com> - 2026-11-27 11:00 +1100

#74397 — data centres powered by renewables

FromOzix <ozix@xizo.am>
Date2026-11-24 08:31 +0800
Subjectdata centres powered by renewables
Message-ID<6b04dadc$1@news.ausics.net>
DUG, a Perth company had plans for years to build a number-cruching HPC 
powered by renewables. That was before the AI boom. It was only going to 
use 15 MW maximum, pretty small alongside today's behemoths. Partly for 
their own use and leasing out surplus capacity. But they gave up on the 
idea in the middle of this year.

[toc] | [next] | [standalone]


#74398

Fromnot@telling.you.invalid (Computer Nerd Kev)
Date2026-11-25 07:35 +1000
Message-ID<6b060320@news.ausics.net>
In reply to#74397
Ozix <ozix@xizo.am> wrote:
> DUG, a Perth company had plans for years to build a number-cruching HPC 
> powered by renewables. That was before the AI boom. It was only going to 
> use 15 MW maximum, pretty small alongside today's behemoths. Partly for 
> their own use and leasing out surplus capacity. But they gave up on the 
> idea in the middle of this year.

There's at least one datacentre company in Europe that was
advertising 100% renewable power many years ago, so it's not a new
idea.

-- 
__          __
#_ < |\| |< _#

[toc] | [prev] | [next] | [standalone]


#74399

FromOzix <ozix@xizo.am>
Date2026-11-25 06:11 +0800
Message-ID<6b060b7a$1@news.ausics.net>
In reply to#74398
Computer Nerd Kev wrote:
> Ozix <ozix@xizo.am> wrote:
>> DUG, a Perth company had plans for years to build a number-cruching HPC
>> powered by renewables. That was before the AI boom. It was only going to
>> use 15 MW maximum, pretty small alongside today's behemoths. Partly for
>> their own use and leasing out surplus capacity. But they gave up on the
>> idea in the middle of this year.
> 
> There's at least one datacentre company in Europe that was
> advertising 100% renewable power many years ago, so it's not a new
> idea.
> 
presumably in Iceland

[toc] | [prev] | [next] | [standalone]


#74401

FromComputer Nerd Kev <not@telling.you.invalid>
Date2026-11-25 16:42 +1000
Message-ID<6b06836c@news.ausics.net>
In reply to#74399
Ozix <ozix@xizo.am> wrote:
> Computer Nerd Kev wrote:
>> Ozix <ozix@xizo.am> wrote:
>>> DUG, a Perth company had plans for years to build a number-cruching HPC
>>> powered by renewables. That was before the AI boom. It was only going to
>>> use 15 MW maximum, pretty small alongside today's behemoths. Partly for
>>> their own use and leasing out surplus capacity. But they gave up on the
>>> idea in the middle of this year.
>> 
>> There's at least one datacentre company in Europe that was
>> advertising 100% renewable power many years ago, so it's not a new
>> idea.
>> 
> presumably in Iceland

Found it. No it's in Switzerland and they run their own
hydroelectric generator, but it says here its maximum turbine
capacity is 1.65MW, so a 15MW datacentre would've been much
bigger.

https://datacenterlight.ch/en-us/cms/hydropower/

I think it makes much more sense for these datacentres to operate
next to their own dedicated power generators like that, rather than
sucking up the existing city supply and leaning on government
funded energy projects instead of building new electricity
generation themselves. But of course they'll do whatever's cheapest
while the government lets them (though I wonder if they'll regret
it later if power prices spike when the coal power plants are all
gone).

-- 
__          __
#_ < |\| |< _#

[toc] | [prev] | [next] | [standalone]


#74402

FromKeithr0 <nothing.to.see@here.com.au>
Date2026-11-26 08:55 +1000
Message-ID<nmp7acF4jsnU1@mid.individual.net>
In reply to#74401
On 25/11/2026 4:42 pm, Computer Nerd Kev wrote:
> Ozix <ozix@xizo.am> wrote:
>> Computer Nerd Kev wrote:
>>> Ozix <ozix@xizo.am> wrote:
>>>> DUG, a Perth company had plans for years to build a number-cruching HPC
>>>> powered by renewables. That was before the AI boom. It was only going to
>>>> use 15 MW maximum, pretty small alongside today's behemoths. Partly for
>>>> their own use and leasing out surplus capacity. But they gave up on the
>>>> idea in the middle of this year.
>>>
>>> There's at least one datacentre company in Europe that was
>>> advertising 100% renewable power many years ago, so it's not a new
>>> idea.
>>>
>> presumably in Iceland
> 
> Found it. No it's in Switzerland and they run their own
> hydroelectric generator, but it says here its maximum turbine
> capacity is 1.65MW, so a 15MW datacentre would've been much
> bigger.
> 
> https://datacenterlight.ch/en-us/cms/hydropower/
> 
> I think it makes much more sense for these datacentres to operate
> next to their own dedicated power generators like that, rather than
> sucking up the existing city supply and leaning on government
> funded energy projects instead of building new electricity
> generation themselves. But of course they'll do whatever's cheapest
> while the government lets them (though I wonder if they'll regret
> it later if power prices spike when the coal power plants are all
> gone).
> 
Not sure why we want them here in Oz, they suck up huge quantities of 
power and water, and, once construction is done, employ fuck all people.

[toc] | [prev] | [next] | [standalone]


#74405

FromPetzl <petzlx@gmail.com>
Date2026-11-27 11:00 +1100
Message-ID<lihhglpse342eejerqj3ktlht28qntoeo3@4ax.com>
In reply to#74402
On Thu, 26 Nov 2026 08:55:08 +1000, Keithr0
<nothing.to.see@here.com.au> wrote:

>On 25/11/2026 4:42 pm, Computer Nerd Kev wrote:
>> Ozix <ozix@xizo.am> wrote:
>>> Computer Nerd Kev wrote:
>>>> Ozix <ozix@xizo.am> wrote:
>>>>> DUG, a Perth company had plans for years to build a number-cruching HPC
>>>>> powered by renewables. That was before the AI boom. It was only going to
>>>>> use 15 MW maximum, pretty small alongside today's behemoths. Partly for
>>>>> their own use and leasing out surplus capacity. But they gave up on the
>>>>> idea in the middle of this year.
>>>>
>>>> There's at least one datacentre company in Europe that was
>>>> advertising 100% renewable power many years ago, so it's not a new
>>>> idea.
>>>>
>>> presumably in Iceland
>> 
>> Found it. No it's in Switzerland and they run their own
>> hydroelectric generator, but it says here its maximum turbine
>> capacity is 1.65MW, so a 15MW datacentre would've been much
>> bigger.
>> 
>> https://datacenterlight.ch/en-us/cms/hydropower/
>> 
>> I think it makes much more sense for these datacentres to operate
>> next to their own dedicated power generators like that, rather than
>> sucking up the existing city supply and leaning on government
>> funded energy projects instead of building new electricity
>> generation themselves. But of course they'll do whatever's cheapest
>> while the government lets them (though I wonder if they'll regret
>> it later if power prices spike when the coal power plants are all
>> gone).
>> 
>Not sure why we want them here in Oz, they suck up huge quantities of 
>power and water, and, once construction is done, employ fuck all people.
>
got me also, the neighbors don't like them according to news
<https://www.abc.net.au/news/2026-11-16/when-community-concerns-collide-in-data-centre-fight/107344810>
      https://tinyurl.com/4avxec9t 

Wonder if they pay meaningful taxation?
-- 
Petzl
An evil enemy will from within, 
will burn his own nation to then rule over the ashes.